A 125kW hybrid solar system delivered for a hospitality sector client, comprising a full engineering suite from audit through to installation.
The client required a large-scale hybrid solar system for a hospitality property, supported by a complete engineering package rather than equipment supply alone.
The engagement followed a full engineering suite: energy audit, engineering design report and CAD-drawn schematics preceded equipment sourcing and installation.
A 180kWp solar PV array paired with 230kWh of LiFePO4 battery storage, configured across a 12 by 15 panel string layout.
180kWp PV array, 230kWh LiFePO4 battery energy storage, 12x15 panel string configuration.
Energy audit, engineering design report, CAD-drawn schematics, equipment supply, installation and commissioning.
The project was completed with the full engineering suite delivered alongside the installed system. Specific energy savings or performance figures are not part of the published project record.