Installation of an 80kW three-phase high voltage inverter with WiFi connectivity, paired with 158.4kWh of storage and 120kWp of solar PV.
The site required a high-capacity, three-phase power system combining solar generation with substantial battery storage and remote connectivity.
The system was engineered to coordinate a high-voltage inverter, large-format storage and a 120kWp PV array as a single integrated installation.
An 80kW three-phase high voltage inverter with WiFi plug connectivity, supported by 158.4kWh of storage and a 120kWp PV array.
80kW three-phase high voltage inverter (WiFi-enabled), 158.4kWh energy storage, 120kWp solar PV array.
Installation and commissioning of the inverter, storage and PV array as an integrated system.
The system was installed and commissioned. Specific performance or generation figures are not part of the published project record.