SCADA-Ready Systems with 250kVA UPS & 211.1kWh BESS

SCADA-Ready Systems with 250kVA UPS & 211.1kWh BESS - Commercial / Industrial

Project Overview

Implementation of SCADA-ready systems, a 250kVA online UPS, 211.1kWh battery energy storage and automated switchgear.

Challenge / Requirement

The site required critical power infrastructure that was SCADA-ready, combining online UPS protection with substantial battery storage and automated switchgear coordination.

Adimsira Approach

The power infrastructure was implemented as a coordinated system, with UPS, BESS and switchgear engineered to work together and support SCADA integration.

Solution

A 250kVA online UPS and 211.1kWh BESS installation with automated switchgear, implemented as a SCADA-ready system.

Technology / Systems

250kVA online UPS, 211.1kWh battery energy storage system, automated switchgear, SCADA-ready architecture.

Scope of Work

Installation and commissioning of the UPS, BESS and automated switchgear as an integrated, SCADA-ready system.

Outcome / Value Delivered

The system was installed and commissioned. Specific performance or uptime figures are not part of the published project record.